Where you gave up supporting interior walls, to let a ceiling-same steel beams to support the ceiling. Through the entire thickness of the outer walls, a 28 cm thick non-flammable rock wool insulation was used. The low heat transfer coefficient of 0.09 W / m K corresponds to the passive house standard. The manufacturer GAPP let underpin his future-oriented building concept through a fire safety advice and exceeds the requirements of the legislator in all respects. Of course energy saving objects of ZimmerMeisterHaus meet the criteria of a particularly energy-efficient construction: this is no coincidence. The renewable resource wood provides a solid foundation for the sustainable buildings of the future. The energy plus concept of Manufactory GAPP with passive house compatible building envelope and photovoltaic rooftop Panel clearly exceeds even the strict requirements of the KFW-Bank for the Energieeinsparverordnung 40. Only a very low residual energy requirement is required for heating the apartments. This provides a highly efficient geothermal heat pump, the the photovoltaic system installed on the roof provides free electricity for the heat pump. So the future residents year after year completely save the usual costs for heating and domestic hot water preparation. Compared to conventionally built homes m is an energy cost savings of about 800 in the year the trend-setting energy plus buildings at a size of apartment of approx. 90 m. And not only that: the current surplus of around 25,000 kWh/a is fed into the public grid, the owners get rewarded the supply it continuously. Feel comfortable in the natural building material beneficial life in wood House is expressed in security. Visible permanent wood-concrete composite floors are one of the secrets that provide for the comfort in the wooden building in Ehingen. The pleasant climate is immediately perceptible and tangible. By its nature-related moisture-regulating properties, wood controls the living environment like self ideal well-being. Wood is good for simply”it brings Walter Carpenter Maier on the point. We build houses out of wood for decades and are thrilled to be able to transfer our knowledge and our solutions now available in the multi-storey residential building.” With all the additional benefits is also not significantly more expensive than a conventional House.” Background Zimmermeisterhaus manufactures: ZimmerMeisterHaus is an Association of nationwide 85 wood construction manufactures. The Group of selected companies for innovation and top service in timber construction is 25 years. Members enjoy each other through intensive exchange of experience and professional training and offer its customers comprehensive expertise – always up to date. For 5 years, the Group also intensively engaged in the further development of multi-storey wood housing, supplemented by a professional exchange with the wood construction experts of Switzerland. Regional independently realize the ZimmerMeisterHaus manufactures annually more than 1,500 building projects in the field of construction, cultivation/increase and object construction. There is more information under. author: Eva Mittner
Tag: construction
Sustainable Architect Houses
New procedures and calculation methods allow new architectural masterpieces. Is the appropriate construction products increased a value placed on: environmental product declarations. (tdx) At the choice of the suitable construction ensure nowadays particularly on the viability or sustainability of the product. Renowned planners and architects find themselves an enormous responsibility and go ahead to lead by example so that sustainability in the building is continued. Two such architectural example occurred recently. The interest of planners in these prototypes was the architecture for future living concepts of sustainability and energy efficiency. Building materials were analysed and evaluated and at the end they had, through an environmental product Declaration (EPD) of the Institute of building and environment (IBU), construction products declared the nose forward.
\”Lace and blunt angle, horizontal and vertical surfaces in every direction: the Libeskind Villa\” is truly exceptional and reminds one of the Architect Daniel Libeskind Diamonds. The gem thanks to the large glass surfaces and the material zinc comes to the rays. \”The decision for RHEINZINK was easy for Daniel Libeskind: it is a great, beautiful, and at the same time sustainable material\”. Helpful and the stumbling block for his decision was the environmental product Declaration of the IBU, which transparently sets out all information on the material. Sowurden equipped with zinc facade and roof connections. Another highlight: the in-roof solar plant, which was integrated into the zinc roof area as a non-visible Solarthermieelemente. It provides in conjunction with an intelligent control system of RHEINZINK-2Q and the combination with a geothermal energy system for low energy costs and an autonomous heating heat supply of the building CO2 balance of the roofing is therefore further improved. Best energy standards also provides the insulation of the building. With the generation of 032 of ISOVER came another construction product to use, which is equipped with an EPD of the IBU.
Underwriter Faraman Starts Construction
Already sold 90 percent of the first phase of construction; energy-efficient implementation with appropriate promotion of Magdeburg, 26.06.2013. Berlin is currently in demand as hardly another city in Germany with investors. In contrast to the cities of Munich, Frankfurt/Main and Hamburg are to acquire residential real estate but still at a fair price and offer the possibility of a private home also middle income families”to create. This target group is the Magdeburg underwriter Faraman and offers InCasa”in the first phase of construction on 13 maisonettes in a terraced house style that arise in the District of Berlin-Karlshorst, requested. The residential complex consists of two building complexes. The apartments offer on 138 to 193 square meters (4 5 room) space, an upscale amenities and an architecture that makes the Sun literally to the roommate. The continuous surface design are modern kitchens, underfloor heating, designer furnishings, guest toilet, parquet flooring and fireplace. In addition, customizable living spaces are variable available.
Two terraces and an unobstructed look at the adjacent Park, as well as a private parking lot complete the Wellness package”. The price per square meter is an average of 2,000 euros. They gave a special significance to the idea of environmental protection. “Through the classification as KfW 85 Energieeffizienzhaus” the purchaser to benefit from promotions and enjoy particularly favorable conditions by the Kreditanstalt fur Wiederaufbau for a part of the financing. 90 Percent of the first phase of construction are already sold and only a few flats for purchase. The underwriter Faraman, which has worked for 16 years in the real estate market and has successfully completed already 67 residential real estate projects, indicating that it has not only the expertise in the area of monument restoration. So the owner-managed company currently, for example, the city Palace Lessing place in Magdeburg renews one of the pre show real estate in the State capital of Saxony-Anhalt. Rather it will also include of the construction of new, high-quality residential property in sought after locations in the coming years to expand.
Long-Burning Stoves
So let's talk about the long burning stoves. Manufacturers of long burning stoves such as 'Termofr' produces a line of furnaces and other Butakova or furnace Baleryan – argue that these furnaces in the mode of long burning or else it is called gasification mode, can burn from 7 to 12 hours for one clutch. But is this true? Many have doubts on this score. How is it that you can only pair of tabs a day to keep the room warm. In fact, actually it's true and false. Why? – You ask. Let's try to understand this in stages.
Firstly: gasification mode does allow firewood to smolder for a long time in the oven. The question is by how much? If you have a long oven combustion is properly installed with all the features of your home, and you clearly understand how to adjust the damper for this mode, you secured performance long burning 12.7 hours. Wood must be dry – it very important condition. Because if you have the raw wood, they can not ignite at all. Or do you dress up to give them a flare up not in the mode of decay, and in an open fire, as in a conventional stove.
But then if you miss the point dry wood, they can burn in just one hour. Second: If you have dry wood, then you should close the ash pit (in the furnace is Butakova ash pan) and the damper. The flap with all that data in furnaces and cut still missing in smoke chimney at 25%.